HGracePowerAI
Canada Electricity & AI Infrastructure Outlook 2050
Official national data updated through 2025
Province comparison baseline: 2023

Scenario controls

For full custom sliders, use the dashboard on desktop/tablet. Scenario selection works on mobile.

Can Canada power the AI boom?

A source-labelled view of electricity generation, capacity and the potential grid impact of AI/data-centre growth through 2050.

CER Current Measures
Verified national anchor: Statistics Canada reports 639.5 TWh of electricity generation in 2025, up 2.9% from 2024. Renewables supplied 64.1% of production, led by hydro at 54.5%.
Canada generation, 2025
639.5 TWh
Statistics Canada • preliminary
Renewable share, 2025
64.1%
Hydro + wind + solar
CER 2050 installed capacity
310 GW
Current Measures scenario
CER total electricity demand growth
~50%
2023 → 2050

CER 2050 installed-capacity scenarios

What matters for AI infrastructure

Electricity demand rises in every CER scenario. Total demand grows about 30% in Lower, nearly 50% in Current Measures, 80% in Higher and nearly 120% in Canada Net-zero.
AI is a major uncertainty, not the only driver. CER tests data-centre load from 1.5 GW to 12 GW by 2050 while electrification, GDP, hydrogen and other loads also change.
Capacity is not the same as usable energy. A 1 GW data centre running almost continuously needs much more than 1 GW of wind or solar nameplate capacity unless storage/firming is available.

2023 province baseline used for comparisons

For province-to-province comparisons, this dashboard uses a consistent 2023 CER/Statistics Canada-derived dataset rather than mixing years. The national headline above uses the newer 2025 Statistics Canada release.

Province electricity profiles

2023 generation, installed capacity and renewable-generation share for all ten provinces.

Official 2023 comparison baseline

Annual electricity generation

Installed generation capacity

Province comparison table

ProvinceGeneration (TWh)Capacity (GW)Renewable generationImplied system CFStatus
Implied system capacity factor = annual generation ÷ (installed capacity × 8,760 hours). It is a descriptive utilization ratio, not a technology-specific capacity factor.

AI and data-centre electricity demand

Translate continuous computing load into annual energy, then test where that load might land.

3.5 GW
Official CER assumption: by 2050, data-centre load reaches 1.5 GW in the Lower scenario, 3.5 GW in Current Measures and Canada Net-zero, and 12 GW in Higher. CER says most baseline growth occurs in Ontario, Alberta and Quebec.
Selected data-centre load
3.5 GW
Scenario input
Annual electricity at selected utilization
28.2 TWh
Load × 8,760 × utilization
Share of 2025 Canadian generation
4.4%
Screening comparison only
Higher scenario reference
~100 TWh
CER estimate from 12 GW growth

Illustrative provincial allocation of selected AI load

HGrace model assumption

Allocation assumption

Ontario 35%, Quebec 25%, Alberta 20%, B.C. 8%. The remaining 12% is distributed across the other six provinces.
This is not a CER province forecast. CER only states that most baseline data-centre growth is expected in Ontario, Alberta and Quebec; the exact shares used here are an HGrace scenario assumption.
Use the national slider as the primary stress test. A 20 GW custom case at 92% utilization would consume about 161 TWh annually.

2050 capacity build requirement

A screening model of additional nameplate capacity needed to serve modeled growth, including AI, under the selected scenario.

CER Current Measures
Important modelling correction: CER's total electricity-growth scenarios already include data-centre load. This model therefore keeps total 2050 demand aligned to the selected CER growth rate and allocates the AI portion within that total—rather than adding AI twice.
Modeled province generation need, 2050
—
Ten-province model total
AI electricity inside total
—
Not double-counted
Additional nameplate capacity
—
At selected new-build CF + reserve
2050 total modeled capacity
—
2023 base + modeled additions

2023 installed capacity + modeled additional requirement

2023 installedAdditional build

Scenario interpretation

Province2023 Gen.2050 NeedAI Energy2023 Cap.Added Cap.2050 Modeled Cap.

AI Power Readiness Index

A transparent analytical screening score—not an official ranking or site-selection recommendation.

HGrace model
How to read it: the index rewards current grid scale, renewable-generation share, lower modeled build pressure and an AI ecosystem proxy. It does not yet include local transmission constraints, interconnection queues, land, water, electricity contracts or project permitting.

Readiness score / 100

Score weights

30% — Grid scale: generation and installed capacity.
30% — Build pressure: lower modeled incremental capacity relative to the current fleet scores better.
25% — Renewable generation share: proxy for lower-carbon electricity availability.
15% — AI ecosystem proxy: based on the illustrative provincial allocation assumption.
RankProvinceScoreGrid scaleBuild pressureRenewable shareAI ecosystem proxy

Methodology & official sources

Every reported fact is separated from HGrace assumptions so the analysis remains auditable.

Source-labelled

Statistics Canada — Electricity supply and disposition, 2025

National 2025 generation: 639.5 million MWh. Renewable share: 64.1%; hydro: 54.5%; wind: 8.2%; solar: 1.4%. Released October 16, 2026.

Open official release ↗

Canada Energy Regulator — Canada's Energy Future 2026

National electricity-demand and installed-capacity scenarios through 2050. Capacity reaches approximately 270, 310, 360 and 400 GW across Lower, Current Measures, Higher and Canada Net-zero.

Open CER scenario results ↗

CER — Data Centre Load Growth

2050 data-centre assumptions: 1.5 GW Lower, 3.5 GW Current Measures/Net-zero and 12 GW Higher. Most baseline growth is expected in Ontario, Alberta and Quebec.

Open CER assumptions ↗

CER — Renewable Energy in Canada provincial profiles

Consistent 2023 province generation, installed capacity and renewable-generation shares. CER states the underlying historical generation/capacity data are primarily drawn from Statistics Canada electricity tables.

Open CER province comparison ↗

Statistics Canada Table 25-10-0020-01

Annual electricity generation by class of producer and type of generation, by province/territory.

Open table ↗

Statistics Canada Table 25-10-0022-01

Annual installed generating capacity by type of electricity generation, by province/territory.

Open table ↗

HGrace scenario methodology

AI annual energy (TWh) = AI load (GW) × 8.76 × utilization
Scenario 2050 total = 2023 province baseline total × (1 + selected CER total electricity-growth rate)
Non-AI growth = Scenario total − AI annual energy; AI is then allocated across provinces using explicit scenario shares.
Additional nameplate capacity (GW) = incremental annual generation (TWh) ÷ (8.76 × new-build capacity factor) × (1 + reserve margin)
This is a strategic screening model, not an hourly production-cost, transmission, reliability or interconnection study. Provincial generation does not equal provincial consumption because provinces import and export electricity.